FAQ: Quantities, purchasing and delivery
24 answers on this topic
On this page we answer 24 frequently asked questions on the topic Quantities, purchasing and delivery. You will find all other topics in the FAQ overview. Your question is not listed? Call us at +49 208 30271194 or send your inquiry via the contact form.
Single parts, prototypes, series
Do you manufacture single parts from a quantity of 1?
Yes, MWA manufactures from batch size 1 up to series production. Typical single parts are spare parts, prototypes, fixtures, conversion parts and large components that are only needed once. There is no minimum quantity. Please note that for single parts, programming and setup are borne by one piece, so the unit price is higher than in series production.
Do you manufacture prototypes and sample parts?
Yes, we manufacture prototypes and sample parts to drawing or 3D model. With prototypes, designs often still change, so a clear revision level on every drawing is important. If a series is planned later, tell us right away; we will then already take a production-ready manufacturing strategy into account for the prototype and can give advice on reducing costs.
Do you also manufacture series and repeat parts?
Yes, in addition to single parts, MWA manufactures small series, series and recurring parts, with a framework agreement on request. For repeat parts, the program and clamping concept are retained, so follow-up orders run faster and with consistent quality. State the annual quantity and the desired call-off quantities in your inquiry, and we will calculate accordingly.
What is a framework agreement with call-off orders?
A framework agreement fixes the price, total quantity and term for a component, and you then call off the specific delivery quantities as needed. For you, this provides planning certainty on price and availability without having to take and store the entire quantity at once. For us, it enables more economical batch planning. MWA offers framework agreements for recurring requirements; we agree the terms individually.
What is a small series in machining?
In machining, a small series refers to production in low quantities that goes beyond single parts but is not yet large-scale series production. There is no fixed threshold; the classification depends on component size and industry. What matters economically is that setup and programming effort is spread over several parts. MWA manufactures small series as well as single parts and series.
Is there a minimum order quantity?
No, MWA has no minimum quantity; we manufacture from batch size 1 up to series production. Whether a single part or a small quantity is economical for you can be seen in the quotation. It is often worthwhile to request several quantities, for example 1, 5 and 20 pieces, to compare the influence of setup costs on the unit price.
Can you manufacture a part again later to the same drawing?
Yes, we manufacture repeat parts again to the same drawing. When reordering, state the part number and revision level so that it is clear which version applies. If the drawing has changed since the last order, please send the current version along. For regular requirements, a framework agreement with call-off orders is worthwhile.
How do you achieve a smooth transition from prototype to series production?
The transition from prototype to series production works best when the drawing, tolerances and material are frozen before series start. The prototypes are often followed by a first article delivery with a first article inspection report (FAI), which you approve before the series starts. Experience from prototype manufacturing, for example regarding critical tolerances, is fed into series planning. Talk to us early, and we will plan this together.
Delivery and logistics
Do you deliver throughout Germany?
Yes, MWA delivers throughout Germany by parcel service, freight forwarder or with its own vehicle. We load large and heavy parts onto trucks by crane. Alternatively, you can collect the parts in Halberstadt. The appropriate shipping method depends on size, weight and deadline; we state it in the quotation.
What is the lead time for CNC parts?
The lead time depends on the component, quantity, material availability, subcontracted operations such as hardening or coating, and our current workload. We therefore do not give a flat figure but a specific delivery date in the quotation. State your desired date in your inquiry, and we will tell you directly whether it is feasible.
Can you handle rush orders?
Whether a rush order is possible depends on the component, material availability and our current workload. In urgent cases, it is best to call us directly or write to ed.re1795806299tnus-1795806299awm@o1795806299fni1795806299, and we will check at short notice what is feasible. Complete documents and information on whether material is available or can be supplied by you are helpful.
Can I collect the parts in Halberstadt?
Yes, you can collect finished parts from MWA in Halberstadt. Please arrange the collection date with us in advance so that the parts are ready for shipment. We load large and heavy parts onto your vehicle by crane. For this, let us know which vehicle you are coming with and how the load is to be secured.
How are the parts packaged?
Packaging depends on the size, weight, surface and shipping method of the component. Sensitive functional surfaces and fits are protected against damage, and bright steel parts against corrosion. If you have special requirements, such as individual packaging, specific load carriers, crates or labeling, please state them in your inquiry so that we can take them into account in the quotation.
Do you deliver with your own vehicle?
Yes, MWA also delivers parts with its own vehicle. This is particularly useful for large, heavy or sensitive components and for customers within reach of Halberstadt. Whether delivery is made with our own vehicle, by freight forwarder or by parcel service is agreed with you depending on the component and deadline.
Is the delivery date confirmed as binding?
Yes, you receive a delivery date with the order confirmation. It is based on the conditions stated in the quotation and on complete, approved documents. If the drawing, quantity or requirements change after the order, we will agree a new date with you. For customer-supplied material, the date also depends on when the material arrives at our premises.
Can the delivery go to a different address, for example directly to my customer?
Talk to us if the parts are to be sent to an address other than your billing address, for example directly to a construction site, an assembly company or your customer. Ideally, state the delivery address already in your inquiry, as it affects the shipping method and transport costs. Also important are the contact person, delivery times and unloading options on site.
Purchasing and sourcing of turned and milled parts briefly explained
What does the revision index or revision level on a drawing mean?
The revision index (often a letter or a number in the title block, for example “Rev. B” or “Index 02”) shows which version of a drawing is valid. With every change to dimensions, tolerances or material, the index is incremented. It matters for purchasing because the quotation, the order and production must always refer to the same revision. That is why you should state the drawing number and the revision index in both the enquiry and the order. If the revision index changes while an order is in progress, this should be communicated in writing so that the parts are not produced to an old revision.
What do Incoterms such as EXW, FCA and DAP mean for the delivery of parts?
Incoterms are internationally standardised delivery terms published by the International Chamber of Commerce (ICC). They define who pays for transport and from which point the risk passes to the buyer. EXW (Ex Works) means: the buyer collects the goods from the supplier and bears transport and risk from there. With FCA (Free Carrier), the supplier hands the goods over to a carrier nominated by the buyer. With DAP (Delivered at Place), the supplier brings the goods to the agreed place, and unloading is done by the buyer. The agreed term should be stated with the place and the Incoterms year (for example “DAP Hannover, Incoterms 2020”) in the quotation and the order.
What does make-or-buy mean for turned and milled parts?
Make-or-buy is the decision whether a company manufactures a part itself or buys it from a contract manufacturer. Arguments for making it in-house are free internal capacity, core competence and very short lines of communication. Arguments for buying it in are a lack of machines for the size or process, peaks in workload, small quantities for which in-house setup is not worthwhile, and expertise at the supplier. Many companies combine both: core parts in-house, peaks and special parts through contract manufacturing.
Why is a second supplier (second source) worthwhile for machined parts?
A second supplier is an additional, already qualified supplier for the same part. If the main supplier drops out due to illness, machine breakdown or overload, the second supplier can step in without a long start-up period. It also provides benchmarks for quality and delivery time. It makes sense to qualify the second supplier with a small order to the same drawing while there is still no bottleneck.
What is a supplier self-assessment?
A supplier self-assessment is a questionnaire a customer uses to get to know a new supplier before placing an order. Typical questions cover company data, contact persons, certifications such as ISO 9001, machine park, measuring equipment, insurance and environmental management. The questionnaire is often part of supplier approval in quality management. A complete, honest self-assessment saves both sides follow-up questions and speeds up approval.
What is the difference between an enquiry, a quotation, an order and an order confirmation?
In the enquiry, the customer describes what they need, ideally with drawing, material, quantity and requested date. The quotation is the supplier’s answer with price, delivery time and terms. With the order, the customer accepts the quotation. The order confirmation confirms the order in writing and states the binding delivery date. If the order and the order confirmation differ, for example in the drawing revision or the date, this should be clarified immediately. You can send an enquiry to MWA via the contact form.
What does a delivery date given as a calendar week (CW) mean?
In mechanical engineering, delivery dates are often given as a calendar week, for example “delivery CW 12”. This usually means that the goods arrive at the customer’s premises or are ready for dispatch in that week. Exactly what applies should be stated in the quotation or order confirmation, for example “delivery to site CW 12” or “dispatch CW 12”. If you need a fixed day, for example for an assembly, you should expressly agree it as a fixed date.
What is a trial order with a new contract manufacturer?
A trial order is a small first order with which a customer tests a new supplier under real conditions. Dimensional accuracy, surfaces, documents such as the measurement report or material certificate, communication and on-time delivery are assessed. Parts that are needed regularly but are not time-critical are well suited. MWA manufactures from a quantity of 1, so a trial order is also possible with a single part. Find out more on the page From prototype to series.
More FAQ topics
Your question is not listed?
Call us or send us your inquiry with drawing (PDF, STEP, IGES, DXF or DWG) via the form on our contact page. We usually reply within 24 hours on working days – free of charge and without obligation.